Underground hot water piping design for MAK project as part of Worley Parsons' large-scale LNG and energy projects.
Worked as a Senior Mechanical/Piping Engineer at Worley Parsons in a team of 26 engineers to carry out piping design on green field projects. Designed pipe routing, generated Material Take-Offs (MTO), and conducted vendor and customer liaison. Performed pipe stress analysis, pipe isometric verification and checking, and flange leakage design based on ASME Section VIII Division 1 and Division 2. Provided Technical Bid Evaluation (TBE) and generated Purchase Requisitions. Worked on MAK Underground Hot Water Piping, APLNG Post IFC Piping design, and GLNG Interconnect Facility projects concurrently.
Client: MAK
Year: 2013
Location: Brisbane, QLD
Sector: Oil & Gas
Standards: AS4041, B31.3, B31.4, API 610, ASME BPVC Section VIII Div I, AS2885
Team Size: 26