A tailings pump upgrade at Olympic Dam, one of the world's largest copper-gold-uranium deposits.
Worked as a Senior Project Mechanical Engineer on Tailings Pump Upgrade project at Olympic Dam Copper, Gold, Silver and Uranium Mine in Roxby Downs, South Australia. This project was A million worth of total Capital Expenditure. Main responsibilities included overseeing Design and Management of Piping systems. Managed a team of 43 including engineers, boiler makers, fitters, and turners. Olympic Dam is one of the world's largest known copper-gold-uranium-silver deposits, operated by BHP Billiton. The site produces copper cathodes, uranium oxide, gold and silver, and includes integrated mining, processing, smelting and refining operations.
Client: BHP Billiton
Year: 2021
Location: Roxby Downs, SA
Sector: Mining
Standards: AS4100, AS4041
Team Size: 43 including engineers, boiler makers, fitters, turners