Organisation: Sub Contractor to Worley Parsons
Project: APLNG Post IFC Piping design
Project Tenure: 1 Months
Project Type: Green Field
Client: APLNG
Characteristics: Origin is building a Pipeline Gas Compression station at two locations Talinga and Spring Gully. Talinga Piping design was completed and Issued for Construction without obtaining all Vendor data on client request. This project was to obtain Vendor data, carry out Pipe Stress Analysis and finalise the project.
Responsibilities:
- Pipe Stress Analysis
- Pipe Isometric verification and checking
- Liaison with client
- Liaison with vendor