Organisation: Working for AECOM Australia Pty Ltd
Project: Slurry Pipeline (Design)
Project Tenure: 2 months
Project Type: Green Field
Client: Queensland Nickle
Characteristics: Existing Slurry pipe is around 500m long but had Victaulic and Dresser Couplings along its length. Queensland Nickel procedures required Victaulic and Dresser Coupling being removed from this line which made this line stiff and so flexibility had to be added to
Responsibilities:
- Flow and Pressure Drop Analysis
- Pipe Sizing
- Pump Sizing
- Pipe Support Design
- Pipe Stress Analysis
- Liaison with Vendor and client