Organisation: Sub Contractor to Worley Parsons
Project: GLNG Interconnect Facility Project
Project Tenure: 4 Months
Project Type: Green Field
Client: Santos
Characteristics: Santos and QGC are planning to share / transfer gas with each other and a metering and interconnect piping was required to facilitate this. High Pressure Class 600 and Class 900 piping with low temperature services were designed for this project.
Responsibilities:
- Pipe Stress Analysis
- Pipe Isometric verification and checking
- Flange Leakage Design based on ASME Section VIII Division 1 and Division 2
- Material Take-Off (MTO) generation
- Providing Technical Bid Evaluation (TBE)
- Purchase Requisition generation
- Liaison with internal and clients
- Liaison with vendor