Organisation: Sub Contractor to Worley Parsons
Project: MAK Underground Hotwater Piping Stress Analysis Project
Project Tenure: 2 Months
Project Type: Green Field
Client: MAK
Characteristics: A Hotwater piping needs to be installed underground in a mine site in Mongolia. This pipe needs to be insulated to prevent heat loss. The installation is partly in solid rocks and partly in soil that resembles sand. The challenge in this project was to make the system pass with minimum loops.
Responsibilities:
- Pipe Stress Analysis
- Pipe Isometric verification and checking
- Liaison with internal clients (Mech, Process and Civil team)
- Liaison with vendor