Organisation: Sub Contractor to Hyder

Project: QGC / Weir Water Transfer Piping and Pump Design

Project Tenure: 3 Months

Project Type: Green Field

Client: QGC / Weir

Characteristics: 9 pump stations are being commissioned to transfer brine as a part of Water Treatment Plan.  There are two setups considered, Temporary and Permanent.  A Permanent setup consists of Carbon Steel Pipe both Above ground and Below ground, whereas Temporary setup consist of HDPE piping.

Responsibilities:

  • Flow and Pressure drop analysis
  • Pipe Sizing and Pump Sizing
  • Pipe Support Design
  • Pipe Stress Analysis
  • Pipe Isometric verification and checking
  • Finite Element Analysis
  • Liaison with internal and clients
  • Liaison with vendor