Organisation: Sub Contractor to Amec Zektin
Project: Spring Gully Brine Transfer Project
Project Tenure: over 2 Months
Project Type: Green Field
Client: Origin
Characteristics: A pump station is being commissioned to transfer 13.5ML/day water from Spring Gully Pond A, Cells 1 and 3 to Pond B. The pump configuration for initial transfer was 2 x 100% with most piping underground, and 1 x 100% for Permanent installation.
Responsibilities:
- Flow and Pressure drop analysis
- Pipe Sizing and Pump Sizing
- Pipe Support Design
- Liaison with Vendor and client