Organisation: Sub Contractor to Amec Zektin

Project: Spring Gully Brine Transfer Project

Project Tenure: over 2 Months

Project Type: Green Field

Client: Origin

Characteristics: A pump station is being commissioned to transfer 13.5ML/day water from Spring Gully Pond A, Cells 1 and 3 to Pond B. The pump configuration for initial transfer was 2 x 100% with most piping underground, and 1 x 100% for Permanent installation.

Responsibilities:

  • Flow and Pressure drop analysis
  • Pipe Sizing and Pump Sizing
  • Pipe Support Design
  • Liaison with Vendor and client