QGC / Weir Water Transfer Piping and Pump Design

QGC / Weir Water Transfer Piping and Pump Design

Organisation: Sub Contractor to Hyder Project: QGC / Weir Water Transfer Piping and Pump Design Project Tenure: 3 Months Project Type: Green Field Client: QGC / Weir Characteristics: 9 pump stations are being commissioned to transfer brine as a part of Water Treatment...
MAK Underground Hotwater Piping

MAK Underground Hotwater Piping

Organisation: Sub Contractor to Worley Parsons Project: MAK Underground Hotwater Piping Stress Analysis Project Project Tenure: 2 Months Project Type: Green Field Client: MAK Characteristics: A Hotwater piping needs to be installed underground in a mine site in...
Max allowable Flange Loads ASME VIII Div 2

Max allowable Flange Loads ASME VIII Div 2

Everyone that I know of uses Charts for preliminary estimation.  These charts can be for Pipe Thickness, Weight of Pipe, Allowable Loads and so on. Recently I did a project in which the flange design was carried out based on ASME Section VIII Division 2.  As Caesar II...
APLNG Post IFC Piping design

APLNG Post IFC Piping design

Organisation: Sub Contractor to Worley Parsons Project: APLNG Post IFC Piping design Project Tenure: 1 Months Project Type: Green Field Client: APLNG Characteristics: Origin is building a Pipeline Gas Compression station at two locations Talinga and Spring Gully. ...