QGC / Weir Water Transfer Piping and Pump Design

QGC / Weir Water Transfer Piping and Pump Design

Organisation: Sub Contractor to Hyder Project: QGC / Weir Water Transfer Piping and Pump Design Project Tenure: 3 Months Project Type: Green Field Client: QGC / Weir Characteristics: 9 pump stations are being commissioned to transfer brine as a part of Water Treatment...
APLNG Post IFC Piping design

APLNG Post IFC Piping design

Organisation: Sub Contractor to Worley Parsons Project: APLNG Post IFC Piping design Project Tenure: 1 Months Project Type: Green Field Client: APLNG Characteristics: Origin is building a Pipeline Gas Compression station at two locations Talinga and Spring Gully. ...
GLNG Interconnect Facility

GLNG Interconnect Facility

Organisation: Sub Contractor to Worley Parsons Project: GLNG Interconnect Facility Project Project Tenure: 4 Months Project Type: Green Field Client: Santos Characteristics: Santos and QGC are planning to share / transfer gas with each other and a metering and...
Feasibility study of an International Airport Fuel System

Feasibility study of an International Airport Fuel System

Organisation: Working for AECOM Australia Pty Ltd Project: Feasibility study of an International Airport Fuel System Project Tenure: 2 months Project Type: Green Field Client: Hong Kong International Airport Characteristics: Expansion of an International Airport...